Community Park Pond Rehab
The Hampton Township Community Park Pond Maintenance & Enhancement Project’s overall objective involves performing maintenance per DEP MS4 requirements and
The Hampton Township Community Park Pond Maintenance & Enhancement Project’s overall objective involves performing maintenance per DEP MS4 requirements and
The total project area is 9.35 acres with an expected 7.48 acres of disturbance.The erosion and sedimentation control measures will
PVEDI provided Survey, Civil, Structural and Landscape Architecture services for the master plan of this mixed-use development that includes commercial,
PVEDI developed this 3.4 acre site for the construction of St. Cla ir Hospital. The site, formerly host to a
The Pitt Ohio Hazelton addition and renovation project includes considerable improvements throughout the facility. The design team was tasked with
Contaminant fate and transport, document review, General consulting, GIS mapping, remedial action cost estimating.
PVEDI provided civil engineering, landscape architecture, surveying, and laser scanning services for Rockwell Park, a mixed-use redevelopment in Pittsburgh, Pennsylvania,
PVEDI provided civil engineering, survey, stormwater management, erosion and sediment control, landscape architecture, and architectural services for this 15-acre mixed-use